Ready To Build C.I.C - Est 2025 - API Enabled Surveying + AI Contracting + CNC Manufacture + CO-OP Build
CURRENTLY NOT PICKING UP FLOOR AREA AND ASSUMING ROOF IS 100m2.
Pavillion type of roof is needed to be included.
Compass, angle of south light needs to be included
Currently shows way higher estimate than is expected. Too little is better than too much.
https://open-elevation.com/
https://developers.google.com/maps/documentation/solar/overview
https://developers.google.com/maps/documentation/elevation/overview